求一段关于互联网的英语的对话两人的对话,250字左右,单词不要太复杂,最要紧的是快!

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/10 10:54:32

求一段关于互联网的英语的对话两人的对话,250字左右,单词不要太复杂,最要紧的是快!
求一段关于互联网的英语的对话
两人的对话,
250字左右,
单词不要太复杂,
最要紧的是快!

求一段关于互联网的英语的对话两人的对话,250字左右,单词不要太复杂,最要紧的是快!
去这看看,

A:Hello,is that Peter?
B:Speaking.
A:Do you surf the Internet as usual now?
B:Of course.Yes.How about you?
A:Enn..I'm not allowed to do that,for mom says I am taking the National Entra...

全部展开

A:Hello,is that Peter?
B:Speaking.
A:Do you surf the Internet as usual now?
B:Of course.Yes.How about you?
A:Enn..I'm not allowed to do that,for mom says I am taking the National Entrance University Exam .
B;Poor person.In fact,you can use the Internet to study yourself,right?
A;Yeah.I can learn English and do some reading there.
B:Moreover,you could ask your questions to your frinds online.
A:So it's convenient for us to learn more online.
B:I think so.

收起

Uses entire station meter Shi Ceda the cross section the method mainly to have the coordinate and the opposite side survey law two kinds. Erects the control point the entire station meter the coordina...

全部展开

Uses entire station meter Shi Ceda the cross section the method mainly to have the coordinate and the opposite side survey law two kinds. Erects the control point the entire station meter the coordinate survey law, the merit is may unifies the topographic survey and the big cross section survey also carries on, but increased the quantity to take the instrumental height the error, the survey elevation's precision compared does not erect must be slightly low in the control point coordinate and the opposite side survey law. Does not measure takes the instrumental height the coordinate and the opposite side survey method measuring accuracy is the same, may meet four and so on leveling requirements at least. The recommendation uses entire station meter opposite side survey law Shi Ceda the cross section. The opposite side survey law is more advanced than the coordinate survey law, the measuring accuracy is higher, sets up a station the operation only to need to level off the instrument strictly, the survey record data quantity are few, moreover does not need to transform the data through the computer, makes the simple algebra and the operation to various measuring points' elevation difference, then forms the big cross section survey achievement. Should pay attention to the following several points for the guarantee elevation measuring accuracy: Observes the personnel first to want the fine sight to the pole's prism center; Maintains as far as possible to the pole highly is lowest and fixed invariable, holds the pole person to pour on rhabdomere's round standard to soak closely comes, guaranteed that is at the vertical condition to the pole; Between two measuring point's distances cannot be too long, farthest does not surpass 500 m; Should establish as far as possible the instrument in two measuring point segment center point or approaches the segment. Looking from the practical application, the entire station meter is more advanced than the traditional level, the survey and the computation work load are the reductions greatly, and are been few topographical condition's limit, the work nimble, direct-viewing, the operation is simple, the survey speed is quick, the precision is high, may raise the working efficiency greatly and reduce the labor intensity, can replace the level to carry on the big cross section survey.

收起